OpenGov / Ionwave13pg8pufxpw
Open
26-0070 Kuehler River Crossing
- Response deadline
- Aug 6, 2026 Closed
- Date posted
- Jul 2, 2026
- Source
- Open notice
Description
The Project has been designed by BGE, Inc. The Project is anticipated to include but not limited to the following items within its scope: (i) construction of approximately 150 linear feet (“LF”) of 6-inch and 12-inch water main by open-cut; (ii) construction of approximately 520 LF of 12-inch water main by horizontal directional drilling under the Guadalupe River; (iii) abandonment of the existing water main; (iv) connections to the NBU water system; (v) storm water pollution prevention; (vi) restoration; and (vii) all other appurtenances necessary to complete the Project.
Documents
No documents posted for this opportunity.
Similar contracts
- AC Pipe Replacement Solms (IH 35)TXDue Sep 18, 2026
- Downtown to Loop Pressure Zone (PZ) Conversion ProjectTXDue Sep 30, 2026
- 26-0141 Power Transformer PurchaseTXDue Aug 3, 2026
- Government Affairs and Lobbying ServicesTXDue Jul 6, 2026