26-0070 Kuehler River Crossing

New Braunfels Utilities — Purchasing · TX
Response deadline
Aug 6, 2026
Due in 19 days
Date posted
Jul 2, 2026

Description

The Project has been designed by BGE, Inc. The Project is anticipated to include but not limited to the following items within its scope: (i) construction of approximately 150 linear feet (“LF”) of 6-inch and 12-inch water main by open-cut; (ii) construction of approximately 520 LF of 12-inch water main by horizontal directional drilling under the Guadalupe River; (iii) abandonment of the existing water main; (iv) connections to the NBU water system; (v) storm water pollution prevention; (vi) restoration; and (vii) all other appurtenances necessary to complete the Project.