OpenGov / IonwaveIFB 102226
Open
S-70 Stuart Point Road Sidewalk
- Response deadline
- Oct 22, 2026 Closed
- Date posted
- Sep 16, 2026
- Source
- Open notice
Description
The S-70 (Stuart Point Road) Sidewalk Project is a new 8’ sidewalk on Stuart Point Road from US 21 (Trask Parkway) intersection to Seacrest Lane/Delaney Circle/Abdullah Lane intersection. This sidewalk is approximately 2 miles long and will connect to Whale Branch Elementary and Middle Schools. The proposed design will remain within present right of way, but there are areas of new right of way for drainage improvements or to save trees.
Documents
No documents posted for this opportunity.
Similar contracts
- SCDOT Less than 2000 ADT Pavement evaluationSCDue Dec 17, 2026
- Beaufort County 2027 ResurfacingSCDue Nov 17, 2026
- Broad River Boat Landing Floating Dock ReplacementSCDue Sep 23, 2026
- On-Call Site/Civil Engineering ServicesSCDue Sep 22, 2026
- Sunset-Miller Resurfacing &Traffic CalmingSCDue Aug 26, 2026