Civic AI
Civic AI
Procurement intelligence
SAM.govN4008526R0219
Open

N4008526R0219, Design Bid Build - Decentralize Steam - Provide Natural Gas Fired Boilers at Buildings 23A, 43, 44, 49 at Naval Health Care New England (NHCNE) Newport, RI.

DEPT OF DEFENSE · Rhode Island
Response deadline
Aug 26, 2026
Due in 15 days
Date posted
Aug 11, 2026

Description

NAVFAC Solicitation No. : N4008526R0219, Design Bid Build - Decentralize Steam - Provide Natural Gas Fired Boilers at Buildings 23A, 43, 44, 49 at Naval Health Care New England (NHCNE) Newport, RI THIS ACTION IS RESERVED FOR DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT N40085-21-D-0052 Benaka Inc. N40085-21-D-0053 CCI Utility and Construction Services, LLC N40085-21-D-0054 Kunj Construction Corporation N40085-21-D-0055 Ocean Construction Services N40085-21-D-0056 PEM-Harkins Joint Venture N40085-21-D-0057 Tantara Corporation N40085-21-D-0066 J&J Contractors, Inc. DESCRIPTION OF WORK: The work includes removal of (4) facilities from the building A6 steam supply system. The (4) buildings being taken off of steam service (23A, 43, 44, and 49) shall have their steam to heating hotwater exchangers removed and natural gas boilers provided in their place. Building B23A shall also have its domestic hot water heaters replaced. Work includes the trenching and backfilling for the installation of gas piping to each of four buildings, restoration of paving due to gas piping installation, The contractor shall be responsible for connecting to the utility meter and provide gas distribution to the installed boilers. This amendment 0001 incorporates the following : (1) A6 Decentralization_DRAWINGS_Rev-20260805.pdf (2) A6 Decentralization Submittal Register.pdf (3) Basis of Design for reference only.pdf (4) Final Soil Management Plan Effective February 4, 2026 Signed.pdf (5) ICRA Requirements.pdf (6) NHCNE Decentralize Steam - PPI_Final_Responses (7) Site Visit Sign in sheet (8) Proposal Due date extended to 26 AUGUST 2026 02:00 PM This amendment 0002 incorporates the following : Correction of Pre Proposal Inquiry 47, Yes, Buy American requirements do apply to the project per FAR 52.225-9 Buy American-Construction Materials.

Classifications

Documents (18)

  • NHCNE Decentralize Steam - PPI_Final_Responses.xlsx
    .xlsx26 KB
    Download
  • Attachment I - SECNAV 5512 FORM.pdf
    .pdf1.3 MB
    Download
  • Attachment A - 26R0219 - Steam Decentralization General Requirements.pdf
    .pdf340 KB
    Download
  • Attachment C - Decentralization_DRAWINGS.pdf
    .pdf14.3 MB
    Download
  • Decental Steam site visit.pdf
    .pdf31 KB
    Download
  • Attachment B - Decentralization_SPECIFICATION.pdf
    .pdf2.7 MB
    Download
  • Basis of Design_for reference only.pdf
    .pdf158 KB
    Download
  • A6 Decentralization_DRAWINGS_Rev-20260805.pdf
    .pdf13.9 MB
    Download
  • Attachment D - Bid Schedule.pdf
    .pdf119 KB
    Download
  • Attachment G - PIEE Vendor Access Instructions.pdf
    .pdf509 KB
    Download
  • ICRA Requirements.pdf
    .pdf571 KB
    Download
  • A6 Decentralization Submittal Register.pdf
    .pdf289 KB
    Download
  • Attachment H - NSN NHCNE SITE VISIT PROCEDURES.docx
    .docx35 KB
    Download
  • Attachment E - Wage Determination RI20260001.pdf
    .pdf5.5 MB
    Download
  • Attachment J - SITE VISIT MAP.pdf
    .pdf263 KB
    Download
  • Attachment F - Pre-Proposal Inquiry (PPI) form.xlsx
    .xlsx11 KB
    Download
  • NHCNE Decentralize Steam - PPI_Final_Responses R1.xlsx
    .xlsx26 KB
    Download
  • Final Soil Management Plan Effective February 4 2026 Signed.pdf
    .pdf588 KB
    Download

Contacts

Similar contracts

Explore more