SAM.govN4008526R0001
Open
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
DEPT OF DEFENSE · Rhode Island
- Response deadline
- Aug 26, 2026 Due in 13 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
Please see solicitation, amendments, and applicable attachments.
Classifications
Documents (89)
- Attachment C - Construction Experience Project Data Sheet.pdf.pdf307 KBNot yet available
- 24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf.pdf50.0 MBNot yet available
- Pier Pile Plan.pdf.pdf665 KBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf.pdf656 KBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf.pdf9.4 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf.pdf1.8 MBNot yet available
- Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf.pdf2.5 MBNot yet available
- Attachment H - UCCG OPC Pier Price Proposal Form.pdf.pdf244 KBNot yet available
- attachmentNot yet available
- Attachment A - Pre Proposal Inquiry Log.xlsx.xlsx11 KBNot yet available
- Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx.docx58 KBNot yet available
- SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf.pdf3.0 MBNot yet available
- Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf.pdf3.7 MBNot yet available
- SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf.pdf1.9 MBNot yet available
- Amendment 0002 USCG OPC.pdf.pdf275 KBNot yet available
- Attachment U - Appendix A - Pier 1 Extension 1968.pdf.pdf8.0 MBNot yet available
- 1826479dwg04of05_MECH.pdf.pdf12.2 MBNot yet available
- Attachment C - Construction Experience Project Data Sheet.docx.docx13 KBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf.pdf656 KBNot yet available
- Attachment E - Historical Small Business Utilization.docx.docx44 KBNot yet available
- Attachment B - PIEE Vendor Access Instructions.pdf.pdf510 KBNot yet available
- 1826479dwg05of05_ELEC.pdf.pdf15.4 MBNot yet available
- Amendment 0008 USCG OPC.pdf.pdf652 KBNot yet available
- Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx.docx53 KBNot yet available
- Attachment D - Past Performance Questionnaire.docx.docx25 KBNot yet available
- Updated Attachment F - SB Participation Commitment Document.pdf.pdf125 KBNot yet available
- Attachment Z - Pier 1 - Amendment 006 Drawings.pdf.pdf1.1 MBNot yet available
- Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf.pdf278 KBNot yet available
- SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf.pdf4.6 MBNot yet available
- Amendment 0001 USCG OPC.pdf.pdf422 KBNot yet available
- Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx.docx53 KBNot yet available
- Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf.pdf273 KBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf.pdf512 KBNot yet available
- Attachment S - Pier 1 - Amendment 003 Drawings.pdf.pdf18.0 MBNot yet available
- 24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf.pdf2.1 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf.pdf1.0 MBNot yet available
- Attachment L - Site Visit Log.pdf.pdf166 KBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf.pdf11.0 MBNot yet available
- SUB-0284 PDA49B_A.pdf.pdf2.5 MBNot yet available
- Updated Attachment F - SB Participation Commitment Document.docx.docx43 KBNot yet available
- Attachment I - SECNAV FORM 5512.pdf.pdf1.0 MBNot yet available
- Attachment V - Pier 1 - Amendment 004 Drawings.pdf.pdf6.0 MBNot yet available
- Updated Attachment K - WD RI20260001 05-18-2026.pdf.pdf5.5 MBNot yet available
- Amendment 0003 USCG OPC.pdf.pdf808 KBNot yet available
- JA ML-26-40 USCG Kaeser Compressed Air System - Redacted.pdf.pdf171 KBNot yet available
- CJA ML-23-80 - Redacted.pdf.pdf1.2 MBNot yet available
- SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf.pdf2.4 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf.pdf26.7 MBNot yet available
- Trestle Summary.pdf.pdf6.1 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf.pdf512 KBNot yet available
- Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf.pdf28.8 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf.pdf978 KBNot yet available
- Updated Attachment G - Individual SB Subcontracting Plan.docx.docx199 KBNot yet available
- Attachment F - SB Participation Commitment Document.pdf.pdf335 KBNot yet available
- Attachment K - WD RI20260001 01-30-2026.pdf.pdf104 KBNot yet available
- Solicitation - N4008526R0001.pdf.pdf1.0 MBNot yet available
- Bulkhead Pile Plan.pdf.pdf504 KBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf.pdf417 KBNot yet available
- 1826479dwg01of05_GEN-CIV.pdf.pdf50.0 MBNot yet available
- Attachment D - Past Performance Questionnaire.pdf.pdf502 KBNot yet available
- Appendix A - Telecom Room Photos.pdf.pdf50.0 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf.pdf40.4 MBNot yet available
- Attachment G - Individual SB Subcontrating Plan.pdf.pdf476 KBNot yet available
- Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx.docx60 KBNot yet available
- Attachment W - Pier 1 - Amendment 005 Drawings.pdf.pdf16.2 MBNot yet available
- Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx.xlsx161 KBNot yet available
- Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf.pdf24.9 MBNot yet available
- Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx.docx52 KBNot yet available
- USCG OPC Pier Amendment 0008 Drawings.pdf.pdf1.3 MBNot yet available
- 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf.pdf421 KBNot yet available
- Amendment 0006 USCG OPC.pdf.pdf798 KBNot yet available
- 24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf.pdf1.7 MBNot yet available
- JA ML-26-43 USCG Sanitary Pumps - Redacted.pdf.pdf190 KBNot yet available
- NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf.pdf32.0 MBNot yet available
- Amendment 0005 USCG OPC.pdf.pdf914 KBNot yet available
- Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf.pdf25.4 MBNot yet available
- JA ML-26-41 USCG Comm Shore Tie Receptacle - Redacted.pdf.pdf183 KBNot yet available
- Attachment J Site Visit Meeting Location.pdf.pdf917 KBNot yet available
- Specifications USCG OPC Newport.pdf.pdf50.0 MBNot yet available
- Attachment E - Historical Small Business Utilization.pdf.pdf350 KBNot yet available
- 1826479dwg03of05_STRUC2.pdf.pdf15.1 MBNot yet available
- Attachment P - Spc 100 Final Specs Appendix F - Soil GW Sed Sampling Reports.pdf.pdf50.0 MBNot yet available
- Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf.pdf661 KBNot yet available
- Attachment R - 26 08 00 - Electrical Shore Ties CSTO (Rev B) - Section 2.4.6 Testing.pdf.pdf1.4 MBNot yet available
- Amendment 0004 USCG OPC.pdf.pdf871 KBNot yet available
- 1826479dwg02of05_STRUC1.pdf.pdf28.6 MBNot yet available
- USCG OPC Pier Amendment 007 Drawings.pdf.pdf45.2 MBNot yet available
- Amendment 0007 USCG OPC.pdf.pdf980 KBNot yet available
- JA ML-26-42 USCG Line Insulation Monitor - Redacted.pdf.pdf188 KBNot yet available
Contacts
- kristy.gerrek@navy.mil7573410089
- amanda.l.bricker.civ@us.navy.mil757341-2074
Similar contracts
- Lowell Creek Tunnel Repairs Industry DayAlaskaDue Aug 24, 2026
- FY27 Maintenance Dredging Yokohama North DockDue Sep 25, 2026
- CONANT BANK STABILIZATIONDue Sep 14, 2026
- USACE SPK Construction - Natomas PP5, Sacramento, CADue Sep 1, 2026
- FY27 Maintenance Dredging Yokohama North DockDue Sep 25, 2026
- CMC Greenspace IFBDue Sep 8, 2026