USCG Sector Delaware Bay Shower Replacement
- Response deadline
- Sep 17, 2026 Due in 3 days
- Date posted
- Sep 14, 2026
- Source
- Open notice
Description
9/11/2026: Question - At the walk thru it was stated that we are replacing the shower stall same as existing. That is a shower base and fiberglass fabricated walls. Patch in tile around shower as required. The scope of work I interpret as installing new base pan and installing subway ceramic tile on the shower walls from floor to ceiling. Please clarify what is to be provided. Answer: We want the entire shower replaced including pan and wall. We understand some of the tiles will need to be replaced, so we ask to either replace with direct copy of what is already there or recommend an accent border. Question - So, the walls and base will be fiberglass to match existing and patch ceramic around the stall. The base and walls are a prefabricated unit that comes in 3 or 4 pieces as a kit. Is that correct? Answer - Yes 8/28/2026: Updates have been made to attachment documents for this solicitation to answer questions posed regarding bid bonds, evaluation criteria and other items. Please review ALL documents as the answers are incorporated into the SOW, Construction RFQ Clauses, and the SF-1442. Further questions should be posed via email to SKCS Sergio Cosby, the listed Contracting Officer's Representative. The contractor shall provide all personnel, equipment, tools, transportation, supervision and other items and services necessary to replace 15 showers in their entirety. All details are included in the SOW.
Classifications
Documents (4)
- SDB SOW Shower renovaton_revised.pdf.pdf743 KBNot yet available
- Davis_Bacon_WD_SDB.pdf.pdf86 KBNot yet available
- SF-1442_SDB_Shower Replacement.pdf.pdf231 KBNot yet available
- Construction RFQ Template (RFO) June with 52.222-90.pdf.pdf335 KBNot yet available
Contacts
- sergio.a.cosby@uscg.mil2068152774
- raymond.a.crowley2@uscg.mil2157785808
Similar contracts
- Replace Fisher House 1 HVAC SystemTexasDue Sep 21, 2026
- Reverse Osmosis System ModificationsMinnesotaDue Sep 23, 2026
- Split-Unit HVAC ReplacementWashingtonDue Sep 24, 2026
- Replace Building Boiler at USCG North Bend, OROregonDue Sep 21, 2026
- Multistack Chillers (Air Cooled), Associated Motor StartersMaputoDue Oct 14, 2026
- Cgc Polar Star Pump PartsWashingtonDue Oct 1, 2026