Split-Unit HVAC Replacement
- Response deadline
- Sep 24, 2026 Due in 10 days
- Date posted
- Sep 14, 2026
- Source
- Open notice
Description
All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT). A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. Desription of Work This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards. The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.
Classifications
Documents (3)
- Solicitation - H9242126QE047 - CO Signed.pdf.pdf2.1 MBNot yet available
- HVAC Floor Plan_Split Units.pptx.pptx640 KBNot yet available
- PWS_1SFG_MICC_Split Units_Updated_2.docx.docx48 KBNot yet available
Contacts
Similar contracts
- Replacement of Air Conditioning Units in Nematology LabHawaiiDue Sep 22, 2026
- Reverse Osmosis System ModificationsMinnesotaDue Sep 23, 2026
- Project # 596-26-4 Construction for FMS Boiler ReplacementKentuckyDue Sep 21, 2026
- Replace Building Boiler at USCG North Bend, OROregonDue Sep 21, 2026
- Multistack Chillers (Air Cooled), Associated Motor StartersMaputoDue Oct 14, 2026
- Cgc Polar Star Pump PartsWashingtonDue Oct 1, 2026