or_oregonbuysS-73000-00016851
Open
US101: Trask River Bridge Proj.
- Response deadline
- Jun 24, 2026 Closed
- Date posted
- —
- Source
- Open notice
Description
ODOT is seeking one qualified contractor to perform erosion control repair work to the Trask River Bridge including: Installing erosion and sediment control features, installing temporary traffic control and water management devices, performing the bridge repair work, and installing right-of-way development and control features including seeding and planting.
Classifications
- NAICS913
Documents
No documents posted for this opportunity.