1674 Southerly Solids Handling Improvements
- Response deadline
- Oct 27, 2026 Due in 48 days
- Date posted
- Sep 8, 2026
- Source
- Open notice
Description
In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Improvements to the Dissolved Air Flotation Unit Process Installation of a new Liquid Sludge Receiving Station adjacent to the existing Sludge Storage Tanks (SSTs), Replacement of piping, valves, vault demolition, and other appurtenances related to two Easterly Sludge Force Main Vaults, Replacement of the existing Waste Heat Boiler (WHB) dry ash pneumatic conveyance system with slurry system, replacement of existing scrubber drain header, and installation of new backup scrubber drain header. Cleaning of sludge, grit, and debris from four (4) of the existing SSTs. Replacement of exhaust fans in four (4) SSTs, Modifications of four (4) SST domes, Installation of air bubble mixing systems in four (4) SSTs. Replacement of existing Maintenance Building Lift Station, Structural repairs to six (6) existing Gravity Thickeners. Replacement of the existing eastern Aerated Grit concrete trailer pad, Installation of a new employee asphalt parking lot. Renovation of Waste Liquor Handling Building including a new bathroom. Replacement of grease piping between Dissolved Air Floatation Unit Process and the Renewable Energy Facility. Pipe removal and replacement in Tunnel 5 including pipe supports.
Documents
No documents posted for this opportunity.
Similar contracts
- Districtwide Elevator ModernizationOHDue Sep 15, 2026
- Easterly Chemically Enhanced High-Rate Treatment Facility 2nd RebidOHDue Jul 23, 2026
- Easterly Fire Alarm System ReplacementOHDue Jul 7, 2026
- Big Creek TunnelOHDue Jul 15, 2026
- Westerly Trickling Filters and Solids Contact Tanks Aeration ImprovementsOHDue Jul 14, 2026
- Southerly Tunnel Dewatering Pump StationOHDue Aug 27, 2026