ionwavePWP-WA-2026-531 Addendum 2
Open
Pagni 2 Well and Zolezzi 3 Well Construction and Testing
- Response deadline
- Oct 13, 2026 Closed
- Date posted
- Sep 15, 2026
- Source
- Open notice
Description
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to drill, construct, develop, and test pump two (2) production wells via the dual-tube air flooded reverse drilling method employing concentric dual-wall drill pipe. The wells will be constructed of stainless-steel casing and screen, glass beads, and range from 10 inches I.D. to 14 inches I.D.and 250 ft. to 530 ft. in depth. The wells will be drilled within 100 ft of existing production wells that will not be operational during drilling but must be preserved for future use.
Documents
No documents posted for this opportunity.
Contacts
- shuxhold@tmwa.com(775) 834-8056
Similar contracts
- 6th Street Water Main AbandonmentNVDue Oct 27, 2026
- 6th Street Water Main AbandonmentNVDue Oct 27, 2026
- Plumas St Water Main ReplacementNVDue Oct 28, 2026
- Plumas St Water Main ReplacementNVDue Oct 21, 2026
- E Street & F Street Water Main RelocationNVDue Oct 13, 2026
- Chalk Bluff MCC ImprovementNVDue Oct 7, 2026