Civic AI
Civic AI
Procurement intelligence
ionwavePWP-WA-2026-531 Addendum 2
Open

Pagni 2 Well and Zolezzi 3 Well Construction and Testing

Response deadline
Oct 13, 2026
Closed
Date posted
Sep 15, 2026

Description

Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to drill, construct, develop, and test pump two (2) production wells via the dual-tube air flooded reverse drilling method employing concentric dual-wall drill pipe. The wells will be constructed of stainless-steel casing and screen, glass beads, and range from 10 inches I.D. to 14 inches I.D.and 250 ft. to 530 ft. in depth. The wells will be drilled within 100 ft of existing production wells that will not be operational during drilling but must be preserved for future use.

Documents

No documents posted for this opportunity.

Contacts

Similar contracts

Explore more