ionwavePWP-WA-2026-535 (Chalk Bluff MCC Improvement)
Open
Chalk Bluff MCC Improvement
- Response deadline
- Oct 7, 2026 Closed
- Date posted
- Sep 16, 2026
- Source
- Open notice
Description
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to (1) modify and replace the existing 480V, 300A motor control center (MCC) main section with a new 600A MCC main section at the Decant Building; (2) replace existing 25 kV load-break elbows within existing transformers, switches, and underground vaults; (3) replace existing fault indicators within existing transformers, switch, and underground vaults; and (4) install concrete aprons at various underground vault locations.
Documents
No documents posted for this opportunity.
Contacts
- shuxhold@tmwa.com(775) 834-8056
Similar contracts
- 6th Street Water Main AbandonmentNVDue Oct 27, 2026
- 6th Street Water Main AbandonmentNVDue Oct 27, 2026
- Plumas St Water Main ReplacementNVDue Oct 28, 2026
- Plumas St Water Main ReplacementNVDue Oct 21, 2026
- E Street & F Street Water Main RelocationNVDue Oct 13, 2026
- Mae Anne 1 BPS GeneratorNVDue Oct 6, 2026