Keystone Avenue Water Main Replacement
- Response deadline
- Sep 24, 2026 Closed
- Date posted
- Sep 2, 2026
- Source
- Open notice
Description
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the replacement of approximately 1290 linear feet of existing 6" cast iron and transite main with new 6-inch restrained ductile iron pipe in place with vertical offsets, installation of air release valve assembly, fittings, and appurtenances. The project also includes surface restoration (temporary pavement patching) as a result of water main installation. All content viewed and/or downloaded is considered confidential information and shall be used by the Recipient solely for the purpose of evaluating and potentially submitting a bid for the Project, and not in any way detrimental to TMWA. Recipient shall not copy or otherwise reproduce any confidential information and may not distribute any information to any third-party that is not necessary for purposes of evaluating and submitting a bid for the Project. The Engineer's estimate is: $877,216 - $1,072,152 This Project is deemed a Horizontal Construction Project.
Documents
No documents posted for this opportunity.
Contacts
- mstewart@tmwa.com(775) 834-8059
Similar contracts
- Goldenrod Drive Water Main ImprovementNVDue Oct 1, 2026
- Goldenrod Drive Water Main ImprovementNVDue Oct 1, 2026
- Fleish Hydroelectric Conveyance ImprovementsNVDue Sep 2, 2026
- Fleish Hydroelectric Conveyance ImprovementsNVDue Aug 26, 2026
- Fleish Hydroelectric Conveyance ImprovementsNVDue Sep 17, 2026
- Fleish Hydroelectric Conveyance ImprovementsNVDue Aug 26, 2026