ionwavePWP-WA-2027-004 (Goldenrod Drive Water Main Improvement)
Open
Goldenrod Drive Water Main Improvement
- Response deadline
- Oct 1, 2026 Closed
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the construction of approximately 4250’ of 12” ductile iron main and fittings with inline gate valves, flushes, and air release valves. This main will tie into existing mains on both ends with no service laterals or fire hydrants between the points of connection. An existing vault with straight-through piping must be modified to a pressure regulating station with a new concrete vault lid.
Documents
No documents posted for this opportunity.
Contacts
- mstewart@tmwa.com(775) 834-8059
Similar contracts
- 6th Street Water Main AbandonmentNVDue Oct 27, 2026
- 6th Street Water Main AbandonmentNVDue Oct 27, 2026
- Plumas St Water Main ReplacementNVDue Oct 28, 2026
- Plumas St Water Main ReplacementNVDue Oct 21, 2026
- E Street & F Street Water Main RelocationNVDue Oct 13, 2026
- Chalk Bluff MCC ImprovementNVDue Oct 7, 2026