OpenGov / IonwaveFY27-Const. ITB-008
Open
Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades
- Response deadline
- Sep 29, 2026 Due in 45 days
- Date posted
- Aug 14, 2026
- Source
- Open notice
Description
The Work to be performed as per the DAF Unit 1 & 2 Upgrade Project Manual includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: 1. Modification of the air water saturation system for the dissolved air floatation process at the PRWRF. Scope includes new air-entraining pumps, necessary electrical connections, structural stand for break tank which supplies non-potable water to the air entraining pumps. 2. SCADA and control integration associated with all newly installed equipment 3. Associated demolition, abandonment, and replacement of all required disciplines/divisions.
Documents
No documents posted for this opportunity.