Assunpink Creek Site 8 Dam Rehab – NRCS-New Jersey
- Response deadline
- Sep 18, 2026 Due in 9 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
Posting amended 9/9/2026 to update SBA Size Standard to $45million *Posting amended 9/3/2026 to add Attacahment 2 Drawings document to the Attahcments/Links. Posting updated project completion time to 180 days after notice to proceed is issued. Please see attached attachment/specifications document for further details. No Site Showing information at this time. Posting will be amended if site showing date/time becomes availlable. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12FPC326Q0056 is issued as a Request for Quotation (RFQ) for the Assunpink Creek Site 8 Dam Rehab for NRCS-NJ office. The objectives of this project are to rehabilitate the dam to meet or exceed state and federal dam safety criteria and to maintain the current level of flood protection provided by Assunpink Creek Watershed Dam Site # 8 by implementing the established design for rehabilitation. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 The small business size standard is $40M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will beconsidered by the agency.
Classifications
Documents (6)
- Attachment 5 WD NJ2026056 8-13-26.pdf.pdf73 KBNot yet available
- C04_12FPC326Q0056.pdf.pdf985 KBNot yet available
- Attachment 4 Vendor Information Sheet.docx.docx23 KBNot yet available
- Attachment 3 Quote Sheet.xlsx.xlsx14 KBNot yet available
- Attachment 2 Drawings_Final_Desi.pdf.pdf50.0 MBNot yet available
- Attachment 1 Site 8 Dam_Specifications.pdf.pdf11.6 MBNot yet available
Contacts
Similar contracts
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CACaliforniaDue Sep 16, 2026
- Fort Eustis Dredge Material Management Area (FEDMMA)VirginiaDue Oct 6, 2026
- Maintenance Dredging at TyndallDue Sep 23, 2026
- Y--Timucuan Ecological and Historic Preserve TIMU-335507 Stabilize Kingsley PlanDue Oct 30, 2026
- MRLS L-385 Line Creek Underseepage Deficiencies (Riverside, MO)MissouriDue Sep 23, 2026
- Storm Water Retention Pond RehabilitationDue Sep 18, 2026