USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CA
- Response deadline
- Sep 16, 2026 Due in 7 days
- Date posted
- Sep 10, 2026
- Source
- Open notice
Description
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-bid-build (DBB) construction services to be performed in support of the Natomas Reach I Contract 2 (RIC2) at Sacramento, California (CA). The project supports the American River Common Features (ARCF), Natomas Basin Project, located within the great Sacramento region of California. RIC2 is a continuation of Contract 1 which provided cutoff walls for seepage mitigation in the levees for the entire reach of Natomas Reach I, extending from Northgate Boulevard to Gateway Oaks Drive along the American River levee. Contract 2 project requires flattening the landside slope along the American River from Gateway Oaks Drive to the Northgate Boulevard and along the NEMDC. Total length of slope flattening is approximately 2.18 miles and includes site excavation and re-use of approximately 15,000 cubic yard levee embankment fill and borrow site excavation and import of approximately 12,000 cubic yard levee embankment fill. The work also includes the relocation of utilities, construction of a 12-foot maintenance road at the landside toe, and tree removal. Activities that impact the levee prism will only be permitted between 15 April and 1 November. The estimated cost for the project is $10,000,000 to $13,000,000. The Government intends to solicit an Invitation for Bids (IFB) that will result in award of a firm-fixed price contract. The North American Industrial Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the United States Small Business Administration (SBA), is $45,500,000.00 annual revenue The Product and Service Code (PSC) is Y1LC, Construction of Tunnels and Subsurface Structures. The solicitation is issued as a total small business set-aside through the Procurement Integrated Enterprise Environment (PIEE - https://piee.eb.mil) and Governmentwide Point of Entry, the System for Award Management (SAM - www.SAM.gov).The Government will conduct a pre-bid conference and site walk on 17 August 2026. The solicitation and attachments are posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. All prospective Offerors should be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid. Copies of the solicitation and attachments are available for inspection when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this posting or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice. ------------ Amendment 0001 is issued to: 1. Extend the bid due date to 16 September 2026, 0900 / 09:00 AM Pacific Time. 2. Extend the bid opening to 16 September 2026, 1200 / 12:00 PM Pacific Time. 3. Revise solicitation attachments A05, A06, and A07. 4. Add new solicitation attachments: A06, A09, A10, A11, A12, A13, A14, and A15. 5. Revise solicitation section 00 10 00, CLIN Schedule. Update section 00 21 00 to require submission of A15, Bid Schedule, in lieu of the SF 1442 section 00 10 00, CLIN Schedule. PLEASE NOTE - New and revised attachments are posted on www.SAM.gov only, due to current PIEE system errors.
Classifications
Documents (14)
- B08 - W9123826BA010 A06 - City of Sacramento Pipe Valve Locations - 198009.pdf.pdf4.5 MBNot yet available
- B08 - W9123826BA010 A09 - Natomas AECOM Draft Brookfield Borrow Investigation Report - 20230921.pdf.pdf14.3 MBNot yet available
- attachmentNot yet available
- B08 - W9123826BA010 A13 - Plan Sheet V-110 Revision - 20260831.pdf.pdf190 KBNot yet available
- B08 - W9123826BA010 A14 - Specification Section 01 57 19 Revision - 20260901.pdf.pdf885 KBNot yet available
- B08 - W9123826BA010 A11 - Plan Sheet G-003 Revision - 20260831.pdf.pdf191 KBNot yet available
- Site Visit Agenda - 26BA010 RIC2 - 20260817.pdf.pdf131 KBNot yet available
- Site Visit Sign In Sheet - 26BA010 RIC2 - 20260817 redacted.pdf.pdf1.5 MBNot yet available
- B08 - W9123826BA010 A05 - ARCF Reach I Geotechnical Data Report - 20110730.pdf.pdf50.0 MBNot yet available
- B08 - W9123826BA010 A07 - DoL CWRR CA20260007 - 20260903.pdf.pdf181 KBNot yet available
- B08 - W9123826BA010 A15 - Section 00 10 00 - 26BA010 CLIN Schedule - 20260909.pdf.pdf91 KBNot yet available
- B08 - W9123826BA010 A10 - Natomas Kleinfelder Brookfield Geotechnical Data Report - 20231019.pdf.pdf6.1 MBNot yet available
- B08 - W9123826BA010 A12 - Plan Sheet G-108 Revision - 20260814.pdf.pdf633 KBNot yet available
- B08 - W9123826BA010-A0001 - 20260909.pdf.pdf3.9 MBNot yet available
Contacts
Similar contracts
- Fort Eustis Dredge Material Management Area (FEDMMA)VirginiaDue Oct 6, 2026
- Maintenance Dredging at TyndallDue Sep 23, 2026
- Storm Water Retention Pond RehabilitationDue Sep 18, 2026
- Assunpink Creek Site 8 Dam Rehab – NRCS-New JerseyNew JerseyDue Sep 18, 2026
- Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, FloridaDue Oct 23, 2026
- MRLS L-385 Line Creek Underseepage Deficiencies (Riverside, MO)MissouriDue Sep 23, 2026