The Contractor shall retain professional personnel who have successfully and competently provided commercial facility HVAC maintenance and repair services on projects of similar scope and complexit…
- Response deadline
- Aug 6, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
The Contractor shall retain professional personnel who have successfully and competently provided commercial facility HVAC maintenance and repair services on projects of similar scope and complexity. For the purpose of this contract, routine preventative HVAC maintenance shall be defined as scheduled routine inspection and proactive servicing of HVAC systems so as to facilitate heating/cooling with minimal downtime. The routine maintenance and all repairs shall be provided in accordance with the highest standards of the industry, skill, workmanship, applicable trade practices, meet warranties and in conformance to all applicable laws, codes and regulations. The successful Bidder’s preventative maintenance and repairs shall, at a minimum, include but not limited to the specifications outlined herein. It is the Bidder’s responsibility to provide an appropriate level of on-site staffing, materials, tools, equipment and vehicles to address the scope of work necessary to support all building HVAC equipment during normal business hours 8:00 A.M.- 5:00 P.M. Monday through Friday: Recognized holidays excepted and for response after normal working hours. Bidders’ services are to be compliant with all Federal, State, CARB, AQMD, OSHA and all other applicable regulatory requirements. Provide labor and material to perform preventative maintenance, service, and repair of all HVAC equipment. All filters, belts, annual testing and written report of the chilled water and semi-annual boiler, water treatment, grease, refrigerant, oil, touch-up, paint, and mechanical, electrical, miscellaneous parts and materials needed to maintain the equipment to service, repair, and maintain to the manufacturer's specifications will be included in this proposal. Also includes work as needed to other refrigeration equipment such as ice machines, walk-in coolers, etc. Contractor shall repair or replace failed or worn moving parts (such as, but not limited to: bearings, motor rotors, motor starters, seals, gears, burners, actuators, controls and switches). Prior to beginning any repair or replacement, Contractor will troubleshoot the system to diagnose the system's problems. Contractor shall itemize the equipment list covered as repairable or replaceable. If HVAC Equipment is not repairable, contractor will contact the City representative with an estimate to replace with an equivalent type. Work not included in this quote will be as follows: Original system design and installation; utility company service problems.; Non-moving parts such as heat exchangers, boiler tubes, shells, condenser tubes, , gas, and water piping ; natural gas supply; air distribution duct work; air balance; thermal insulation; improper operation; negligence or misuse of equipment by persons occupying the space, the owner, the owner's representative, or vandals; alteration, additions, or repairs made by others', catastrophic acts of nature; equipment interiors and exteriors; electrical service beyond the parts of the heating; cooling, and ventilation equipment; electrolysis; work required by governmental agencies or insurance agencies; removing, replacing, or altering any part of the building structure in the performance of this agreement. Individual ceiling mounted restroom ventilation fans are also excluded from this agreement.
Documents (2)
- RFP 320-190526AG - HVAC Maintenance FY27.pdfapplication/pdf508 KBNot yet available
- 2026 HVAC Equipment list.pdfapplication/pdf186 KBNot yet available
Contacts
Similar contracts
- The City of Rocky Mount (City) is soliciting proposals from qualified and experienced firms or individual consultants for the 2027-2029 Consolidated Plan and One-Year Annual Action Plan in order t…NCDue Nov 3, 2026
- The Owner is procuring five (5) circuit breakers for the installation into the North POD Substation. Bids will be received on one (1) schedule for the purchase of five (5) 69kV, 3000 A power circu…NCDue Oct 15, 2026
- Rocky Mount wishes to facilitate the selection of a preferred vendor for the purchase of wooden distribution poles. Rocky Mount desires: • To establish a relationship with a manufacturer. MATERIAL …NCDue Oct 13, 2026
- General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment S…NCDue Oct 14, 2026
- The City of Rocky Mount (City) seeks the services of a qualified and licensed contractor to install one replacement hydraulic cylinder on the North Bascule Gate at the Tar River Water Supply Reserv…NCDue Oct 19, 2026
- The Contractor awarded this contract shall practice acceptable safety requirements at all times when performing the landscaping requirements. Contractor shall be responsible for supplying all perso…NCDue Oct 20, 2026