General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment S…
- Response deadline
- Oct 14, 2026 Due in 9 days
- Date posted
- Oct 5, 2026
- Source
- Open notice
Description
General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment System for the transformer which has been designed to contain accidental spills and/or tank rupture within the area surrounding the power transformer. The installation of this system involves the excavation of a large basin around the transformer foundation. The basin will be permanently formed with reinforced concrete walls and floors. The containment basin is designed with concrete flush splash pads to allow all rainwater to drain out at a single outlet. The Contractor shall be responsible for furnishing the labor and materials to install the concrete basins, and shall be responsible for the labor to complete the installation of the pumps and all associated electrical/plumbing materials for a complete system. The Contractor shall furnish the mechanical sump package as outlined in the "List of Materials for the Oil Containment System" following these specifications. The Contractor shall furnish all concrete, reinforcing steel, galvanized steel bar grating, and framing materials for the concrete basin.
Documents (5)
- RFP 320040226FD Substation 10 Transformer Upgrade Addendum 1 (1).pdfapplication/pdf9.2 MBNot yet available
- RFP 320040226FD Labor OFM.pdfapplication/pdf328 KBNot yet available
- RFP 320040226FD Rebid Installation of the Substation 10 Transformer Upgrade Addendum 2.pdfapplication/pdf221 KBNot yet available
- RFP 320040226FD Substation 10 Transformer Upgrade (1).pdfapplication/pdf23.2 MBNot yet available
- RFP 320040226FD Sign In Sheet Pre-Bid Meeting.pdfapplication/pdf126 KBNot yet available
Contacts
Similar contracts
- Rocky Mount wishes to facilitate the selection of a preferred vendor for the purchase of wooden distribution poles. Rocky Mount desires: • To establish a relationship with a manufacturer. MATERIAL …NCDue Oct 13, 2026
- The City of Rocky Mount (City) seeks the services of a qualified and licensed contractor to install one replacement hydraulic cylinder on the North Bascule Gate at the Tar River Water Supply Reserv…NCDue Oct 19, 2026
- The City of Rocky Mount Wastewater Treatment Division is seeking quotations for the supply of replacement pump parts necessary to support the continued operation and maintenance of existing pump eq…NCDue Oct 9, 2026
- The Contractor awarded this contract shall practice acceptable safety requirements at all times when performing the landscaping requirements. Contractor shall be responsible for supplying all perso…NCDue Oct 20, 2026
- The scope of work includes but is not limited to the following: HVAC, Plumbing, Carpentry, Painting & Wallpaper, Drywall & Plaster, Floor Coverings, Electrical, and Roofing Repairs. The scope is sp…NCDue Oct 6, 2026
- CCA-TREATED SOUTHERN PINE DIST POLES 1. MATERIAL Specifications for southern yellow pine poles. All lengths and classes shall meet the requirements set forth in ANSI specifications and dimension…NCDue Sep 30, 2026