nc_evp700-2027-OPER-03
Open
Resurfacing, Patching and Repair of Town streets including ADA ramp replacement, utility adjustments, thermoplastic striping and curb/gutter/sidewalk removal and replacement.
- Response deadline
- Sep 3, 2026 Due in 22 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Resurfacing, Patching and Repair of Town streets including ADA ramp replacement, utility adjustments, thermoplastic striping and curb/gutter/sidewalk removal and replacement.
Documents (1)
- Street Rehabilitation Advertisement.700-2027-OPER-03.pdfapplication/pdf162 KBNot yet available
Contacts
Similar contracts
- Liberty and West Main Pump Stations Decommissioning consist of the decommissioning of two pump stations, the installation of approximately 2,694 LF of 8” PVC and DI sanitary sewer line, the install…NCDue Aug 27, 2026
- Construction of Sidewalk improvements along the East Main Street corridor, including installation of new sidewalks on both sides of roadway, grading, drainage and hydraulic features, traffic signal…NCDue Jul 23, 2026