nc_evp700-700-2027-ENG-01
Open
Construction of a pole barn structure, including foundations, structural framing, roofing, siding, and all associated building components
- Response deadline
- Oct 21, 2026 Due in 25 days
- Date posted
- Sep 25, 2026
- Source
- Open notice
Description
Construction of a pole barn structure, including foundations, structural framing, roofing, siding, and all associated building components.
Documents (1)
- 700-2027-ENG-01 Fire Station 2.pdfapplication/pdf66 KBNot yet available
Contacts
Similar contracts
- Town of Clayton is seeking proposals for a New Comprehensive Plan. The Plan will need to set the stage for the Clayton of tomorrow, accounts for land use challenges of a fast-growing town in a metr…NCDue Oct 2, 2026
- Resurfacing, Patching and Repair of Town streets including ADA ramp replacement, utility adjustments, thermoplastic striping and curb/gutter/sidewalk removal and replacementNCDue Sep 3, 2026
- Liberty and West Main Pump Stations Decommissioning consist of the decommissioning of two pump stations, the installation of approximately 2,694 LF of 8” PVC and DI sanitary sewer line, the install…NCDue Aug 27, 2026
- Construction of Sidewalk improvements along the East Main Street corridor, including installation of new sidewalks on both sides of roadway, grading, drainage and hydraulic features, traffic signal…NCDue Jul 23, 2026