At a minimum, the selected Fabricator shall perform the following: ● Provide or fabricate and machine a new valve shaft ● Provide or fabricate and machine (2) new bronze body bushings ● Machine and…
- Response deadline
- Jul 22, 2026 Due in 5 days
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
At a minimum, the selected Fabricator shall perform the following: ● Provide or fabricate and machine a new valve shaft ● Provide or fabricate and machine (2) new bronze body bushings ● Machine and sleeve the valve body lid ● Provide or fabricate and machine a new body seat ring ● Extract old bolts from the swing seat ● Machine swing seat flat and drill new bolt holes ● Provide or fabricate and machine a new swing seat ● Provide or fabricate and machine new gland bushings ● Fabricate and provide new keys ● Machine and remove old set screws in the armature ● Reassemble and coat the rebuilt valve ● Deliver the rebuilt valve to the Tar River Reservoir Water Treatment Plant, 4489 Leaston Rd., Rocky Mount, NC 27803 (City staff will offload using a City forklift)
Documents (1)
- Competitive Quote QUO-070726FD.pdfapplication/pdf115 KBNot yet available
Contacts
- Alicia Gaines