At a minimum, the selected Fabricator shall perform the following: ● Provide or fabricate and machine a new valve shaft ● Provide or fabricate and machine (2) new bronze body bushings ● Machine and…
- Response deadline
- Jul 22, 2026 Closed
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
At a minimum, the selected Fabricator shall perform the following: ● Provide or fabricate and machine a new valve shaft ● Provide or fabricate and machine (2) new bronze body bushings ● Machine and sleeve the valve body lid ● Provide or fabricate and machine a new body seat ring ● Extract old bolts from the swing seat ● Machine swing seat flat and drill new bolt holes ● Provide or fabricate and machine a new swing seat ● Provide or fabricate and machine new gland bushings ● Fabricate and provide new keys ● Machine and remove old set screws in the armature ● Reassemble and coat the rebuilt valve ● Deliver the rebuilt valve to the Tar River Reservoir Water Treatment Plant, 4489 Leaston Rd., Rocky Mount, NC 27803 (City staff will offload using a City forklift)
Documents (1)
- Competitive Quote QUO-070726FD.pdfapplication/pdf115 KBNot yet available
Contacts
Similar contracts
- CCA-TREATED SOUTHERN PINE DIST POLES 1. MATERIAL Specifications for southern yellow pine poles. All lengths and classes shall meet the requirements set forth in ANSI specifications and dimension…NCDue Sep 30, 2026
- The City of Rocky Mount is seeking proposals from qualified vendors to maintain the elevators for the City of Rocky Mount in line with its original design, performance, and in safe operating condit…NCDue Oct 1, 2026
- The awarded firm shall provide the following: 1. Conceptualize, design, and deliver graphic design materials, including but not limited to brochures, fact sheets, invitations, billboards, magazin…NCDue Aug 6, 2026
- The purpose of this RFP is to solicit proposals for the design of professional print-ready (marks and bleeds) and digital items, including but not limited to magazines, brochures, fliers, billboar…NCDue Aug 6, 2026
- The contractor shall provide all labor, materials, equipment, and supervision necessary to construct the Old Mill Road Sewer Pump Station Force Main, including installation of approximately 3,110 l…NCDue Aug 27, 2026
- The Contractor shall retain professional personnel who have successfully and competently provided commercial facility HVAC maintenance and repair services on projects of similar scope and complexit…NCDue Aug 6, 2026