Sss 569-1(11)6
- Response deadline
- Sep 22, 2026 Due in 19 days
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
The scope of work for this Design-Build Contract includes reconstruction of approximately five miles of Secondary Highway 569 (S-569), also known as Mill Creek Highway, from reference post (RP) 6.11 to RP 11.0. The Project is funded by a Rebuilding American Infrastructure with Sustainability and Equity (RAISE) grant awarded to Anaconda-Deer Lodge County (ADLC). The Project is intended to address existing deficiencies and improve safety. The roadway will be reconstructed to include 12-foot travel lanes and 1-foot shoulders. Additionally, the Project will improve roadway geometrics and reconstruct the existing pavement with new surfacing. The Project will also include new centerline rumble strips, pavement markings, signage, guardrail, improved clear zones and side slopes, and improved hydraulics, culvert and storm water infrastructure. Counties: Deer Lodge Eligibility: Eligible
Documents
No documents posted for this opportunity.