FCI Cumberland-Refurbish Lift Station
- Response deadline
- Aug 13, 2026 Closed
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
Description: The Federal Bureau of Prisons (FBOP), FCI Cumberland, intends to issue a solicitation to refurbish the institution’s wastewater lift station. Work includes demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training. All work must maintain continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, OSHA, and FBOP security requirements. Place of Performance: Federal Correctional Institution Cumberland 14601 Burbridge Rd. SE Cumberland, MD 21502 Scope of Work Includes: (See attached Statement of Work) • Removal and disposal of existing lift station equipment. • Installation of new stainless‑steel NEMA 4X control panel with PLC/relay logic, VFDs, starters, surge protection, HOA switches. • New level‑sensing system with redundancy and audio/visual alarms. • Installation of new grinder, auger, diverters, three wet‑well pumps, and three spare pumps. • Replacement of incoming disconnects, automatic transfer switch, and associated wiring. • Upgraded grounding, conduits, surge/lightning protection, and fail‑safe logic. • Full functional testing, hydrostatic testing, manufacturer startup, and calibration. • Minimum 6 hours of on‑site training and provision of all as‑built documentation, O&M manuals, warranties, schematics, and PLC programming. Evaluation Factors: Award will be made on best value. Price, past performance, and specifications will be evaluated. Amendment to solicitation to add site visit: Site visit scheduled for July 30, 2026 at 10 AM EST Fill out NCIC and Residency forms attached to attend site visit. Please email completed background paperwork to blogsdon@bop.gov before July 28, 2026 at 10 AM to allow time for processing background checks. July 30,2026 - Site Visit Meeting Minutes added. Solicitation Modification added. Additional Pictures of Lift Station added. August 6, 2026 - Site Visit Answers and as-builts added. Picture of Wet Well Pump added. Quotes are due August 13, 2026. 10 AM (EST) Please email quotes to Brian Logsdon at blogsdon@bop.gov
Classifications
Documents (12)
- DownloadNCIC form.pdf.pdf612 KB
- DownloadAdditional Pictures Lift Station.pdf.pdf614 KB
- Downloadas builts.pdf.pdf404 KB
- DownloadApproved Revised 26Z1AN1 Refurbish Lift Station SOW 6-18-26.pdf.pdf669 KB
- DownloadSite Visit Questions - Refurbish Lift Station-Answers.pdf.pdf169 KB
- DownloadSF30-15B10726Q00000055 mod 1.pdf.pdf214 KB
- Download15B10726Q00000055.pdf.pdf222 KB
- DownloadPump in Wet Well Picture.jpg.jpg879 KB
- DownloadWage Determination Allegany County MD.pdf.pdf62 KB
- DownloadLift Station pics.pdf.pdf1.4 MB
- DownloadSite Visit Lift Station Meeting Minutes (signed).pdf.pdf589 KB
- DownloadDOJ_Residency_Cert.pdf.pdf7 KB
Contacts
- blogsdon@bop.gov30178410001132
Similar contracts
- Sewage Ejector and Line AssessmentDue Oct 28, 2026
- Y--Rehabilitation of Water and Wastewater SystemDue Oct 7, 2026
- Y--HAVO 326181 Rehabilitate Rainshed&Water TreatmentDue Oct 23, 2026
- East Canal Efficiency ImprovementsDue Nov 20, 2026
- Y--Gray Wall Livestock Water WellDue Oct 26, 2026
- MSD Infrastructure Repairs Phase 2