Y1DZ--502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
- Response deadline
- Sep 4, 2026 Due in 22 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Classifications
Documents (13)
- Attachment 4 - Vol 3 Drawings.pdf.pdf12.4 MBNot yet available
- Amendment 0001.pdf.pdf85 KBNot yet available
- Attachment 7 - Key Subcontractor Information.docx.docx98 KBNot yet available
- Attachment 8 - Key Personnel.docx.docx101 KBNot yet available
- Attachment 2 - Vol 1 Drawings.pdf.pdf14.9 MBNot yet available
- 36C77626R0104.pdf.pdf610 KBNot yet available
- Attachment 11 - Site Visit Details.docx.docx14 KBNot yet available
- Attachment 5 - Vol 4 Drawings.pdf.pdf14.5 MBNot yet available
- Attachment 3 - Volume 2 Drawings.pdf.pdf41.4 MBNot yet available
- Attachment 9 - Division Pricing Template.xlsx.xlsx10 KBNot yet available
- Attachment 1 - Specifications.pdf.pdf23.1 MBNot yet available
- Attachment 6 - Limitations on Subcontracting - Construction.docx.docx28 KBNot yet available
- Attachment 10 - Wage Determination.pdf.pdf37 KBNot yet available
Contacts
- Contract Specialistandrew.mathews2@va.gov216-447-8300
Similar contracts
- EXTERIOR UPGRADE, FRANKFURTDue Aug 31, 2026
- Fort Benning Job Order Contract (JOC)GeorgiaDue Aug 26, 2026
- DB VEHICLE MAINTENANCE FACILITY, BASA AIR BASE, PHILIPPINES. Due Sep 14, 2026
- (SOL. Amendment) MATOC WP_W90VN726RA024_Repair Roof Contingency SQ Ops, B2548Due Aug 21, 2026
- 657-26-602 Create Observation Unit JCMissouriDue Sep 1, 2026
- AMENDMENT 0001 - 19KU2026Q0012: Chancery Annex Restroom, Lactation RM &Locker RMs RenovationḨawallīDue Aug 20, 2026