Y1DZ--502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
- Response deadline
- Sep 4, 2026 Due in 19 days
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Classifications
Documents (15)
- DownloadAttachment 10 - Key Subcontractor Information.docx.docx98 KB
- DownloadAttachment 13 - Wage Determination.pdf.pdf37 KB
- DownloadAttachment 12 - Division Pricing Template.xlsx.xlsx10 KB
- DownloadAttachment 14 - Site Visit Details.docx.docx14 KB
- DownloadAttachment 2 - Vol 1 Drawings.pdf.pdf14.9 MB
- Download36C77626R0104.pdf.pdf610 KB
- DownloadAttachment 5 - Vol 2 Drawings Part 3.pdf.pdf6.2 MB
- DownloadAttachment 9 - Limitations on Subcontracting - Construction.docx.docx28 KB
- DownloadAttachment 11 - Key Personnel.docx.docx101 KB
- DownloadAttachment 1 - Specifications.pdf.pdf23.1 MB
- DownloadAttachment 4 - Vol 2 Drawings Part 2.pdf.pdf8.1 MB
- DownloadAttachment 6 - Vol 2 Drawings Part 4.pdf.pdf5.9 MB
- DownloadAttachment 8 - Vol 4 Drawings.pdf.pdf14.5 MB
- DownloadAttachment 3 - Vol 2 Drawings.pdf.pdf16.6 MB
- DownloadAttachment 7 - Vol 3 Drawings.pdf.pdf12.4 MB
Contacts
- Contract Specialistandrew.mathews2@va.gov216-447-8300
Similar contracts
- Matsushima JASDF Base Storage ShelterMiyagiDue Sep 11, 2026
- AMENDMENT 0002 - 19KU2026Q0012: Chancery Annex Restroom, Lactation RM &Locker RMs RenovationḨawallīDue Aug 20, 2026
- INDUSTRY DAY AND MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale-Hollywood International AirportFloridaDue Aug 27, 2026
- Industry Day U.S. Merchant Marine Academy Campus ModernizationNew YorkDue Oct 15, 2026
- 657-26-602 Create Observation Unit JCMissouriDue Sep 1, 2026
- Fort Benning Job Order Contract (JOC)GeorgiaDue Aug 26, 2026