502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
- Response deadline
- Sep 4, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Classifications
Documents (12)
- DownloadAttachment 4 - Vol 3 Drawings.pdf.pdf12.4 MB
- DownloadAttachment 7 - Key Subcontractor Information.docx.docx98 KB
- DownloadAttachment 8 - Key Personnel.docx.docx101 KB
- DownloadAttachment 2 - Vol 1 Drawings.pdf.pdf14.9 MB
- Download36C77626R0104.pdf.pdf610 KB
- DownloadAttachment 11 - Site Visit Details.docx.docx14 KB
- DownloadAttachment 5 - Vol 4 Drawings.pdf.pdf14.5 MB
- DownloadAttachment 3 - Volume 2 Drawings.pdf.pdf41.4 MB
- DownloadAttachment 9 - Division Pricing Template.xlsx.xlsx10 KB
- DownloadAttachment 1 - Specifications.pdf.pdf23.1 MB
- DownloadAttachment 6 - Limitations on Subcontracting - Construction.docx.docx28 KB
- DownloadAttachment 10 - Wage Determination.pdf.pdf37 KB
Contacts
- Contract Specialistandrew.mathews2@va.gov216-447-8300
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026