Mississippi River & Tributaries, Morganza to the Gulf, Upper Reach F – Falgout Canal Road to Bayou Grand Caillou Flood Gate Structure – Stage 1 Levee Lift Sta. 2280+28 to Sta. 2130+00, Terrebonne Parish, Louisiana
- Response deadline
- Sep 16, 2026 Due in 7 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
MORGANZA TO THE GULF, LOUISIANA REACH F UPPER CONTRACT 1, TERREBONNE PARISH, LOUISIANA THIS SOLICITATION IS ISSUED AS UNRESTRICTED. THE NAICS CODE FOR THIS PROCUREMENT IS 237990. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $25,000,000 AND $100,000,000. IN ACCORDANCE WITH RFO 22.502-2(D), AN EXCEPTION HAS BEEN GRANTED FOR THE USE OF A PROJECT LABOR AGREEMENTS AS REQUIRED UNDER RFO 22.502-1. THEREFORE, A PROJECT LABOR AGREEMENT IS NOT REQUIRED FOR THIS ACQUISITION. THE WORK CONSISTS OF CLEARING AND GRUBBING, EXCAVATION, DEGRADING EXISTING LEVEE, PLACEMENT OF EMBANKMENT AND HIGH STRENGTH GEOTEXTILE, ACCESS ROAD WIDENING, SURFACING WITH GEOTEXTILE SEPARATOR FABRIC FOR ACCESS ROAD ONLY, BORROW PIT DEVELOPMENT, GEOTECHNICAL FOUNDATION INSTRUMENTATION, TURF ESTABLISHMENT, REMOVAL AND REPLACEMENT OF CHAIN LINK FENCING AND CULVERT AND ALL OTHER RELATED INCIDENTAL WORK. ********************************************** 05 AUG 2026 - Corrupted "Plans" file replaced. ********************************************** Amendment 0001: 1. Set a site visit for Wednesday, 19 August 2026 at 10:00 AM, local time. 2. Extend the Q&A period to Friday, 21 August 2026 at 10:00 AM, local time. ********************************************** Amendment 0002: 1. Postpone bid submission to 11 September 2026, 10:00 AM, local time. 2. Postpone the bid opening to 11 September 2026, 11:00 AM, local time. ********************************************** Amendment 0003: 1. Postpone the bid submission to Wednesday, 16 September 2026, 10:00 AM, local time. 2. Postpone the bid opening to Wednesday, 16 September 2026, 11:00 AM, local time. 3. Establish a Q&A period, for inquires in regard to Amendment 0003. 4. Make changes to the specifications and plans as detailed in the following pages. 5. Respond to inquires.
Classifications
Documents (6)
- W912P826BA050.pdf.pdf7.3 MBNot yet available
- W912P826BA050_Plans.pdf.pdf50.0 MBNot yet available
- W912P826BA050 Amendment 0003_Revised Plans.pdf.pdf50.0 MBNot yet available
- W912P826BA050 Amendment 0003.pdf.pdf9.6 MBNot yet available
- W912P826BA050 Amendment 0001.pdf.pdf2.2 MBNot yet available
- W912P826BA050 Amendment 0002.pdf.pdf3.5 MBNot yet available
Contacts
Similar contracts
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CACaliforniaDue Sep 16, 2026
- Fort Eustis Dredge Material Management Area (FEDMMA)VirginiaDue Oct 6, 2026
- Maintenance Dredging at TyndallDue Sep 23, 2026
- Y--Timucuan Ecological and Historic Preserve TIMU-335507 Stabilize Kingsley PlanDue Oct 30, 2026
- MRLS L-385 Line Creek Underseepage Deficiencies (Riverside, MO)MissouriDue Sep 23, 2026
- Storm Water Retention Pond RehabilitationDue Sep 18, 2026