il_dot_wctb055-72J00
Open
9.32 Miles of crack and joint Sealing on IL 4 from 0.3 miles south of IL 104 in Auburn to north of George Street in Virden and on IL 4 from 0.3 miles southwest
- Response deadline
- Jul 31, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
9.32 Miles of crack and joint Sealing on IL 4 from 0.3 miles south of IL 104 in Auburn to north of George Street in Virden and on IL 4 from 0.3 miles southwest of IL 29 (J David Jones Pkwy) to 0.2 miles north of Washington Street.
Documents (1)
- Download055-72J00-pay-items.csvtext/csv1 KB
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806
Similar contracts
- Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May RILDue Jul 31, 2026
- The project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes. The project begins at 51ST Street in the ILDue Jul 31, 2026
- 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line.ILDue Jul 31, 2026
- Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle CoILDue Jul 31, 2026
- (655-Ft) The work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-1423) consists of installation of temporary shoring towILDue Jul 31, 2026
- This project will install fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and mILDue Jul 31, 2026