il_dot_wctb050-72372
Open
14.85 miles of crack and joint sealing on I-155 from 2 miles south of US 136 to the Tazwell County Line; on I-55 from 0.8 miles north of IL 16 to 0.6 miles nort
- Response deadline
- Jul 31, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
14.85 miles of crack and joint sealing on I-155 from 2 miles south of US 136 to the Tazwell County Line; on I-55 from 0.8 miles north of IL 16 to 0.6 miles north of IL 108; on IL 108 at the I-55 interchange.
Documents (2)
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806
Similar contracts
- Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May RILDue Jul 31, 2026
- The project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes. The project begins at 51ST Street in the ILDue Jul 31, 2026
- 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line.ILDue Jul 31, 2026
- Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle CoILDue Jul 31, 2026
- (655-Ft) The work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-1423) consists of installation of temporary shoring towILDue Jul 31, 2026
- This project will install fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and mILDue Jul 31, 2026