il_dot_wctb009-62W20
Open
(1.413-Mile) Bridge Superstructure Replacement (SN 016-0927) consists of widening shoulder widths, replaced approach slabs, continuation of the new shared use p
- Response deadline
- Jul 31, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
(1.413-Mile) Bridge Superstructure Replacement (SN 016-0927) consists of widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal and installation of new guardrail, striping ond drainage improvements. The project is in Oak Park Avenue (FAU Route 2774) over I-80 in Tinley Park, IL.
Documents (2)
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806
Similar contracts
- Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May RILDue Jul 31, 2026
- The project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes. The project begins at 51ST Street in the ILDue Jul 31, 2026
- 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line.ILDue Jul 31, 2026
- Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle CoILDue Jul 31, 2026
- (655-Ft) The work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-1423) consists of installation of temporary shoring towILDue Jul 31, 2026
- This project will install fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and mILDue Jul 31, 2026