il_dot_wctb001-60N10
Open
(3.27-Mile) Roadway Reconstruction, Widening and Realigned project consists of replacement traffic signal, new signalized intersection, retaining Walls, seven m
- Response deadline
- Nov 6, 2026 Closed
- Date posted
- Sep 29, 2026
- Source
- Open notice
Description
(3.27-Mile) Roadway Reconstruction, Widening and Realigned project consists of replacement traffic signal, new signalized intersection, retaining Walls, seven major crossings, a closed drainage system, controlled stiffness column ground improvement, temporary retaining walls. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove Lake County.
Documents (1)
- 001-60N10-pay-items.csvtext/csv50 KBNot yet available
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806
Similar contracts
- 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line.ILDue Jul 31, 2026
- Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May RILDue Jul 31, 2026
- (655-Ft) The work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-1423) consists of installation of temporary shoring towILDue Jul 31, 2026
- Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle CoILDue Jul 31, 2026
- This project will install fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and mILDue Jul 31, 2026
- Class D pavement patching of mainline pavement on F.A.S. Route 2482 (IL 165), beginning at IL 47 and 165 (L.M. 0.00) and ending at McLean_County line in Ford CoILDue Jul 31, 2026