Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveCT227-08
Open

Cloverdale Road, Victory Road to Overland Road

Response deadline
Nov 4, 2026
Due in 14 days
Date posted
Oct 20, 2026

Description

Widening Cloverdale Road from Victory Road to Overland Road to a five (5)-lane configuration, including the construction of median islands, a multi-use pathway, and pedestrian ramps on both sides of the roadway. Additional improvements shall include epoxy coating repairs to three (3) bridge decks; replacement of the existing Eightmile Creek pipe with a forty-eight-inch (48-inch) reinforced concrete pipe (RCP); installation and modification of associated irrigation piping and slide gates; construction of a drainage basin; and installation of Pedestrian Hybrid Beacons (PHBs) at Muir Ridge Drive and Peppermint Drive. The project shall also include sanitary sewer improvements to be performed by the City of Boise.

Documents

No documents posted for this opportunity.

Similar contracts

Explore more