Muscatine-Louisa County Drainage District No. 13 � 2024 Event PL84-99 Flood Repairs
- Response deadline
- Aug 6, 2026 Due in 12 days
- Date posted
- Jul 20, 2026
- Source
- Open notice
Description
B08 - Solicitation AMD 0004: The reason for this amendment is to extend the closing date to 06 August 2026 at 10:00 AM CST, and the BID Opening to 06 August 2026 at 1:00 PM CST. B08 - Solicitation AMD 0003: The reason for this this amendment is to include modified Specification Section 41 65 10 Page 9 and to change the contract duration to 460 days. The modified specifications are included in the attachments section of this opportunity on SAM.gov named, "B08 - AMD 0003 SPECS ONLY_MODIFIED SEC 41 65 10_PG 9.pdf" in its entirety of 280 pages. Be advised that the SF 1442 will remain in the original attachment named "W912EK26BA007 - Muscatine Pump PL84-99 Final Solicitation with specs.pdf" B08 - Solicitation AMD 0002: The reason for this amendment is to extend the closing date to July 23, 2026 @ 10:00 AM CST and to include the BID Opening Meeting details. B07 - Site Visit Sign In_Muscatine PL84-99 Pump Station added in the Attachments/Links on 07 Jul 2026 B08 - Solicitation AMD 0001 added in the Attachments/Links on 02 Jul 2026 INVITATION FOR BID (IFB) No. W912EK26BA007 - MISSISSIPPI RIVER BASIN MUSCATINE-LOUISA COUNTY DRAINAGE DISTRICT NO. 13 LOUISA COUNTY, IOWA 2024 EVENT PL84-99 FLOOD REPAIRS See Section 01 11 00 Summary of Work in the Specifications for a detailed description. NAICS: 237990 Size Standard: $45,000,000.00 CONTRACT COMPLETION DAYS: 365 Calendar Days from NTP 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) SET-ASIDE, INVITATION FOR BID (IFB) ALL QUESTIONS SHALL BE SUBMITTED VIA PROJNET. SEE CLAUSE MVR.02 FOR ADDITIONAL INFORMATION. IFB No. W912EK26BA007 and related Specifications and Plan Set may be found in the Attachmetns/Links Section of this SAM posting.
Classifications
Documents (8)
- Solicitation Amendment W912EK26BA0070001 SF 30.pdf.pdf3.9 MBNot yet available
- B08 - AMD 0003 SPECS ONLY_MODIFIED SEC 41 65 10_PG 9.pdf.pdf1.5 MBNot yet available
- B08 - W912EK26BA007_AMD 0003.pdf.pdf3.8 MBNot yet available
- W912EK26BA007 - MUSCATINE PUMP PL84-99 FINAL SOLICITATION WITH SPECS.pdf.pdf21.8 MBNot yet available
- B07 - Site Visit Sign In_Muscatine PL84-99 Pump Station.pdf.pdf4.6 MBNot yet available
- B08 - W912EK26BA007_AMD 0004.pdf.pdf372 KBNot yet available
- B08 - W912EK26BA007_AMD 0002.pdf.pdf3.9 MBNot yet available
- Attachment J1 Final Plan Set.pdf.pdf50.0 MBNot yet available
Contacts
Similar contracts
- FY26 Maintenance Dredging, Military Ocean Terminal Sunny Point (MOTSU)Due Aug 31, 2026
- GAOA Accessible Upgrades Toilet ReplacementCADue Jul 30, 2026
- Tailwater Volunteer Village Campground ConstructionKYDue Aug 13, 2026
- EAGLE ISLAND CELL 2 IMPROVEMENTSDue Aug 24, 2026
- Houston Ship Channel Expansion Channel Improvement Project (HSC-ECIP), Segment 4 (Boggy Bayou to Sims Bayou) Dredging and Beltway 8 (BW-8) Placement Area Completion WorkDue Aug 13, 2026
- Tailwater Volunteer Village Campground ConstructionDue Aug 13, 2026