SAM.govW912HY26BA019
Open
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
- Response deadline
- Oct 29, 2026 Due in 31 days
- Date posted
- Sep 28, 2026
- Source
- Open notice
Description
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Y--NOAA/USCG Cutter STORIS Homeporting ProjectDue Oct 16, 2026
- Coastwide Beach and Dune Ecosystem RestorationDue Oct 30, 2026
- Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment ProjectDue Oct 2, 2026
- Sources Sought: The Dalles Dam Gate Repair Pit Fire Protection and Life Safety UpgradesDue Oct 15, 2026
- Chief Joseph Dam (CJD) Intake Concrete Stairs RepairWashingtonDue Oct 13, 2026
- Amendment A00001; RFQ 70Z03026CCLEV0117; USCG LORAIN EZ-SUPPLY FLOORING RENEWAL, USCG STA LORAIN, 110 ALABAMA AVE, LORAIN, OH 44052OhioDue Sep 29, 2026