Morgan Falls Loop Trail - Additional Parking Study
- Response deadline
- Nov 11, 2026 Due in 1 day
- Date posted
- Nov 9, 2026
- Source
- Open notice
Description
The City of Sandy Springs intends to award a sole source contract to KAIZEN Collaborative Design, Inc. for the Morgan Falls Loop Trail Additional Parking Study in the amount. The proposed services include evaluating nine potential parking locations along the Springway Trail system to assess construction feasibility, pedestrian and vehicular circulation, permitting requirements, and property owner coordination. KAIZEN is the current designer for the Springway Trail 2C project and has established knowledge of the existing site conditions, project design, and coordination requirements. The City seeks to continue utilizing KAIZEN to maintain consistency with the ongoing trail development, leverage existing project information, and minimize potential delays or duplication of effort associated with transitioning to a new consultant. This proposed procurement is based on standardization and continuity of professional services. Interested vendors who believe they can meet the City's requirements may submit a written challenge with supporting documentation before the closing date identified in the posting.
Classifications
- NAICS02033
Documents (1)
- Sole Source Posting Form_GPR_Kaizen.pdfapplication/pdf334 KBNot yet available
Contacts
- cdonley@sandyspringsga.gov770-206-1467
Similar contracts
- The Texas Department of Criminal Justice (Tdcj) Is Currently Requesting Bids to Establish a Purchase Order for the Procurement of One Disc.TXDue Oct 8, 2026
- Medium Duty Construction EquipmentTXDue Apr 17, 2027
- 27-017-Abernathy Greenway Southside Improvements (Re-bid)GADue Jan 5, 2027
- 27-016-Roadway Asset Inventory and Pavement Condition Assessment ServicesGADue Dec 18, 2026
- 27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027GADue Nov 19, 2026
- Georgia Safe Sidewalks Sidewalk Trip Hazard Removal ServicesGADue Oct 20, 2026