Metts Road Drainage & Repairs Project
- Response deadline
- Sep 18, 2026 Due in 21 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-001-2 Metts Road Drainage & Road Repairs Project. The project consists of demolishing the existing 60-Inch reinforced concrete pipe culvert crossing and constructing a new reinforced concrete triple barrel 10-Ft X 4-Ft box culvert system and roadway improvements including fill slope repair, roadway shoulder repair, subgrade construction, graded aggregate base construction, asphalt pavement construction, signing, and striping. The project is located along Metts Road approximately 700 lineal feet South from the intersection of Two Chop Road and Metts Road near coordinates Latitude 32.567414o, Longitude -81.835880o. All contractors seeking to provide construction delivery services to Bulloch County for this project shall submit evidence of current active approval as a GDOT Prequalified Contractor as of the bid submission deadline on September 18, 2026, 3:00 PM EDT, and as it appears in GDOT¿s Directory of Prequalified Contractors webpage. A bid package may be requested by emailing the Bulloch County Procurement Office, at Procurementeng@bullochcounty.net, going to the Bulloch County website: https://bullochcounty.net/bid-opportunities/ or by going to the Georgia Procurement Registry website: https://doas.ga.gov/state-purchasing/georgia-procurement-registry-local-governments/gpr-overview.
Classifications
- NAICS91223
Documents (2)
- FY27_ENGCP_001_2_MettsRdDrainage_RoadRepairsP.pdfapplication/pdf5.3 MBNot yet available
- PE25195_PlanSet(082526).pdfapplication/pdf8.6 MBNot yet available
Contacts
- pfuller@bullochcounty.net912-764-0165
Similar contracts
- ADVERTISEMENT FOR BIDS-STREET & DRAINAGE IMPROVEMENTS HERITAGE HILLS ROAD, MORRIS ROAD, MANCIL ROADGADue Oct 1, 2026
- BL116-26, Gwinnett County Fire Station #3 RelocationGADue Sep 30, 2026
- Woodlawn Lake Park Site ImprovementsTXDue Sep 25, 2026
- Erosion Control/Retaining Wall SystemGADue Sep 11, 2026
- Laguna Vista Spoil Island Protection Coastal ConstructionTXDue Aug 28, 2026
- structure demo and pad rebuildTXDue Aug 27, 2026