SR 11 at US 78 East Bound Ramp Intersection Improvements - KW Project No. 240294
- Response deadline
- Nov 19, 2026 Due in 28 days
- Date posted
- Oct 21, 2026
- Source
- Open notice
Description
The project consists of widening the SR 11 at US 78 eastbound ramp in Monroe, Georgia, as well as the installation of a new traffic signal at the intersection of SR 11 and US 78 eastbound ramps. The work includes demolition of existing raised medians, roadway widening, milling and resurfacing asphalt, traffic signal installation, striping and road markings, erosion control. Bids for the construction of the Project will be received at the Monroe City Hall located at 215 N Broad Street, until Thursday, November 19th, at 2:00 pm local time. At that time the Bids received will be publicly opened and read. A pre-bid conference for the Project will be held on Thursday, November 12th at 2:00 pm at 215 N. Broad Street Monroe, Georgia 30655. Attendance at the pre-bid conference is encouraged but not required.
Classifications
- NAICS91223
Documents (2)
- 78 Ramp Bid Advertisement.pdfapplication/pdf129 KBNot yet available
- 78 Ramp Bid Manual.pdfapplication/pdf3.2 MBNot yet available
Contacts
- gabidding26@keckwood.com6784174000
Similar contracts
- 412-27 Hamilton E Holmes Elementary School RenovationsGADue Nov 19, 2026
- 2026035-Bid3313 Lra 2026GADue Nov 5, 2026
- Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)TXDue Nov 3, 2026
- Dodge County Fy 2027 Lmig ProjectsGADue Nov 2, 2026
- 2026-036, Holbrook Campground at Midway Road Intersection Improvements, Project T3123GADue Oct 22, 2026
- BL140-26, Construction of Gwinnett County Fire Station #14GADue Oct 28, 2026