Johnson Ave Stormwater & Streetscape
- Response deadline
- Aug 11, 2026 Closed
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project will include installation of new 18''-60'' storm sewer piping and drainage structures; new 8'' sanitary sewer main piping and manholes; new 8'' and 12'' water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and fully closed during certain phases of construction, but closure of the roads and parking lots will need to be kept to a minimum. The Contractor is expected to coordinate all lane/road/parking lot closures necessary throughout construction with the City Engineer. The Contractor will be required to maintain good communication and coordination with the Project Engineer and the City Engineer throughout construction of the project.
Classifications
- NAICS91345
Documents (1)
- 0030 BID ADV_2026JA.pdfapplication/pdf106 KBNot yet available
Contacts
- dappleby@carrollton-ga.gov(770) 830-2000
Similar contracts
- 2026-26 Annual Stormwater Rehabilitation and Maintenance Construction ServicesGADue Jan 12, 2027
- Tuxedo Lane Drainage Improvement Project (10/19 amended)GADue Nov 17, 2026
- Ware County CDBG FY 26 Street and Drainage IimprovementsGADue Nov 23, 2026
- Coffee County CDBG FY25 Street and Drainage ImprovementsGADue Nov 18, 2026
- 27008-4401, FY 2027 Stormwater Infrastructure Replacement & Repair Unit Price ContractGADue Nov 6, 2026
- Pre-Advertisement Notice for Maintenance of Permeable PaversGADue Nov 2, 2026