Civic AI
Civic AI
Procurement intelligence
ga_gprPE-75553-NONST-2027-000000062
Open

JD Cope MV/LV Switchgear

Response deadline
Sep 11, 2026
Due in 27 days
Date posted
Aug 14, 2026

Description

Dalton Utilities is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility, a new 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. Please review the attachment for detailed specifications. The projected award date is September 16th, 2026, with a planned delivery date of November 26th, 2027. The Owner reserves the right to award the project to the Vendor whose bid is determined to be the best overall value for the Owner. This does not guarantee the award of the project to the lowest bidder.

Classifications

Documents (1)

  • 197347_5_5310 Combined.pdf
    application/pdf10.1 MBNot yet available

Contacts

Similar contracts

Explore more