JD Cope MV/LV Switchgear
- Response deadline
- Sep 11, 2026 Due in 27 days
- Date posted
- Aug 14, 2026
- Source
- Open notice
Description
Dalton Utilities is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility, a new 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. Please review the attachment for detailed specifications. The projected award date is September 16th, 2026, with a planned delivery date of November 26th, 2027. The Owner reserves the right to award the project to the Vendor whose bid is determined to be the best overall value for the Owner. This does not guarantee the award of the project to the lowest bidder.
Classifications
- NAICS28567
Documents (1)
- 197347_5_5310 Combined.pdfapplication/pdf10.1 MBNot yet available
Contacts
- dkeaton@dutil.com706-529-1025
Similar contracts
- TDCJ- McConnell Unit - ATS SwitchesTXDue Aug 24, 2026
- 2026 Water Rehabilitation ProjectGADue Sep 11, 2026
- TestGADue Aug 3, 2026
- JD Cope Exhaust Gas compensators and gasketsGADue Jul 22, 2026
- JD Cope GEOTech SurveyGADue Jun 30, 2026
- 2026 Aeration Mixing System Disc ReplacementGADue Jul 6, 2026