ga_gprPE-66888-NONST-2026-000000005
Open
Air Traffic Control Tower Construction
PEACHTREE CITY AIRPORT AUTHORITY · GA
- Response deadline
- Jul 14, 2026 Closed
- Date posted
- Jun 11, 2026
- Source
- Open notice
Description
The Work shall consist of furnishing all labor, materials, equipment, and incidentals necessary for the construction of a new Air Traffic Control Tower (ATCT) building, including associated demolition, site grading, and drainage improvements; installation of utilities; construction of bituminous driveway and parking lot pavement; installation of concrete sidewalks; implementation and maintenance of erosion and sediment control measures; and installation of pavement markings. All work shall be performed in accordance with the plans, specifications, and applicable local, state, and FAA requirements.
Classifications
- NAICS33055
Documents (2)
Contacts
- Laura Schechtellaura.schechtel@mbakerintl.com678-966-6638