Civic AI
Civic AI
Procurement intelligence
ga_gprPE-66888-NONST-2027-000000006
Open

Air Traffic Control Tower Communications and Weather Station Package

Response deadline
Sep 17, 2026
Due in 28 days
Date posted
Aug 19, 2026

Description

This project consists of supplying, installation, test and commission of the new Atlanta Regional Airport Falcon Field Airport ¿ Air Traffic Control Tower (ATCT) Communications and Weather Equipment. Deliver a fully operational communications and weather system that is in compliance with the Federal Contract Tower FAA Minimum Equipment List. Contractor shall provide all labor, tools, materials and equipment and perform all work required for the installation, wiring, connecting, adjusting, testing, commissioning and training and warranting of all items. A new Airfield Lighting Control Panel and Secondary Weather Wind Sensor tower is included in this scope. The Contractor¿s installers shall provide evidence of prior experience on at least three (3) locations within the last five (5) years where as they have demonstrated the ability to install, configure and integrate all equipment needed to meet FAA minimum equipment standards as laid out in FAA Advisory Circular 90-93A and the FAA Contract Tower Minimum Equipment List. Contractor shall provide copies of FCC radiotelephone license for radio certification. Airport has the right, for any reason, to refuse unqualified Contractors regardless of bid price.

Classifications

Documents (2)

  • 00_FFC Tower Comms IFB _ 20260818.pdf
    application/pdf21.1 MBNot yet available
  • C1_Notice _ FINAL.pdf
    application/pdf131 KBNot yet available

Contacts

Similar contracts

Explore more