Civic AI
Civic AI
Procurement intelligence
ga_gprPE-67510-NONST-2027-000000033
Open

2027-180000-0707-001113-Group 6-2 HVAC Replacement

HENRY COUNTY BOARD OF EDUCATION · GA
Response deadline
Aug 6, 2026
Due in 19 days
Date posted
Jul 7, 2026

Description

The project involves comprehensive replacement and upgrade of the building¿s HVAC systems, including wall-hung and rooftop air conditioning units, furnaces, fan coil units, heat pumps, and ceiling-mounted water source heat pumps, with reuse of existing ductwork where feasible. Work also includes installation of new energy recovery units and a roof-mounted kitchen exhaust and make-up air system. The central plant will be fully replaced, including the cooling tower, heat exchanger, pumps, boilers, and associated piping, insulation, and accessories. Additional scope includes integrating all new equipment into the existing DDC controls system and modifying gas piping and electrical connections to support the new installations.

Classifications

Documents (1)

  • 2027_180000_0707_001113_Group 6_2 HVAC Repla.pdf
    application/pdf71 KBNot yet available

Contacts

Explore more