2026023-RFQ2911 Engineering Services for PI# 0021741 CR-580/North Belair Widening Project
- Response deadline
- Jul 16, 2026 Closed
- Date posted
- Jun 17, 2026
- Source
- Open notice
Description
**COMPLETE SOLICITATION DOCUMENTS CAN BE OBTAINED BY REGISTERING WITH BONFIRE, COLUMBIA COUNTY'S E-PROCUREMENT PLATFORM, AT HTTPS://COLUMBIACOUNTYGA.BONFIREHUB.COM** The proposed project (Columbia County PI 0021741) consists of widening an approximately 2.4-mile section of North Belair Road (CR 580) from two lanes to three lanes, extending from Evans to Locks Road to SR 28 (Fury's Ferry Road). To improve corridor-wide safety and operational efficiency, the project will feature one mainline travel lane in each direction, a continuous central turning lane, and select right-turn deceleration lanes designed to effectively separate turning movements from through traffic at high-volume side streets. A key component of this corridor modernization is the installation of a shared-use path, which will provide vital multimodal connectivity for cyclists and pedestrians between the Fury's Ferry Road (SR 28) corridor and Evans Town Center. The project scope also encompasses all associated infrastructure and safety upgrades at the CSX railroad crossing. The selected consultant will be responsible for delivering all project phases¿including concept development, field surveys/database establishment, environmental documentation, public involvement support, preliminary construction plans, subsurface utility engineering (SUE), active utility coordination and relocation management (GDOT Chapter 14 compliance), right-of-way plans, and final construction plans¿in strict accordance with current GDOT policies, guidelines, and the Plan Development Process (PDP).
Classifications
- NAICS92513
Documents (2)
Contacts
Similar contracts
- RFQ-484-072226 PI 0021583 SCOTT BLVD COMPLETE STREETS PLAN Engineering Design ServicesGADue Aug 20, 2026
- PNA 484-090826 Government Estimator Contract Services (State Funded)GADue Aug 7, 2026
- FY26-CP-E15 Professional Services for Construction Engineering & InspectionGADue Jun 26, 2026
- 2026030-BID5100 Blanchard WTP Hypochlorite System ImprovementsGADue Sep 29, 2026
- 2026029-Bid3313 Boardwalk Replacement at Reed Creek Interpretive CenterGADue Aug 27, 2026
- 2026028-BID3313 Savannah Rapids Pavilion Bank StabilizationGADue Aug 27, 2026