2026 LMIG Roadway Improvements
- Response deadline
- Aug 6, 2026 Due in 19 days
- Date posted
- Jul 7, 2026
- Source
- Open notice
Description
City of Hoschton, Georgia 2026 LMIG Roadway Improvements on New Street, East Broad Street, Oak Street, Joshua Way, Fawn Court, Josh Pirkle Road, and Hawthorne Way Alley. Bids will be received at City of Hoschton, City Hall, 61 City Square, Hoschton Georgia, 30548 until 2:00 p.m. on Thursday, August 6, 2026. The Project consists of, but is not limited to the following major elements: Approximately 480 Tons of 9.5 mm Asphalt Superpave, 286 Tons of Asphalt Patching, 4,300 SY of 12-inch Soil-Cement Stabilization (CSRB), 430 SY of 6-inch Graded Aggregate Base Course, 98 CY of Class B Concrete Base and Pavement Widening, 120 CY of Foundational Backfill Material, 340 LF of Header Curb, 30 LF of 24-inch RCP Storm Drain, 524 LF of 18-inch RCP Storm Drain, 35 LF of 15-inch RCP Storm Drain, 30 Drainage Structures, 3,200 LF of 5-inch White Thermoplastic Pavement Striping, 10,200 LF of 5-inch Yellow Thermoplastic Pavement Striping, 60 LF of 24-inch Thermoplastic Pavement Striping, Signage, Adjusting Structures to Grade, Shoulder Reconstruction, Traffic and Erosion Control Measures. Time of completion for all work associated with this project shall be ninety (90) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. A Bid Bond will be required with proposal submission. Copies of Contract Documents, Specifications, and Construction Drawings may be obtained by contacting Jessica James of Engineering Management, Inc. at 303 Swanson Drive Lawrenceville, GA 30043, or Email jjames@eminc.biz, or Phone 770-962-1387 or Fax 770-962-8010.
Classifications
- NAICS91345
Documents (1)
- SEC00030.pdfapplication/pdf108 KBNot yet available
Contacts
- Jennifer Harrisonjkidd@cityofhoschton.com706 654 3034