2026 St. Mary¿s Dr. Storm Improvements & Paving
- Response deadline
- Dec 10, 2026 Due in 29 days
- Date posted
- Nov 10, 2026
- Source
- Open notice
Description
The Work to be completed for the 2026 St. Mary¿s Dr. Storm Improvements & Paving is described briefly as follows: The project consists of removing approx.. 30 LF of existing 24¿ RCP across a road and replacing it with 30 LF of 30¿ RCP, removing & replacing 2 double wing catch basins, remove & replace approx.. 100 LF of curb & gutter, cut 2 ex. 15¿ HDPE storm pipes from the inside that are protruding into ex. 30¿ CMP and seal the connections. Project includes approx.. 2700 LF of resurfacing/milling & overlay improvements on St Mary¿s Dr.. Work includes (but is not limited to) asphalt milling, Open-Graded Interlayer asphaltic concrete, asphalt pavement overlay, asphalt leveling course, pavement striping and marking replacement, overlay/pavement patch, traffic control, erosion control, and other miscellaneous work.
Classifications
- NAICS91345
Documents (1)
- Ad_St Marys Dr Storm Improvements and Paving.pdfapplication/pdf185 KBNot yet available
Contacts
- mjackson@waycrossga.gov912-287-2957
Similar contracts
- Ware County TIA, PI# 0020588, Gibbs Lane- Street and Drainage ImprovementsGADue Dec 15, 2026
- ITB2026-114 Gravity Sewer Replacement South Zone 1GADue Dec 2, 2026
- ITB2026-115 Gravity Sewer Replacement South Zone 2GADue Dec 2, 2026
- Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 BondTXDue Dec 1, 2026
- Exit 24 - Sanitary Sewer System Extension (SEID Grant)GADue Dec 1, 2026
- Riverview Golf Course Manhole RepairGADue Nov 24, 2026