INDUSTRY DAY AND MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale-Hollywood International Airport
- Response deadline
- Aug 27, 2026 Due in 15 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
This is the Market Survey and Industry Day notice for the Design and Build of the new Fort Lauderdale-Hollywood International Airport (PIH) Air Traffic Control Tower (ATCT) in Fort Lauderdale, FL. The FAA has a potential upcoming project for the Design and Build of a new FLL ATCT, in Fort Lauderdale, FL. The FAA anticipates utilizing the Progressive Design Build (PDB) method for this procurement. The FAA is seeking interested sources capable of completing this requirement. The magnitude of this requirement is estimated to be between $75,000,000.00 and $100,000,000.00. This market survey is being conducted in accordance with FAA Acquisition Management System (AMS) Policy section 3.2.1.2.1 Market Analysis. Additionally, the purpose of this notice is to request participation in Industry Day one-on-one discussions. See attached notice for full details.
Classifications
Documents (2)
Contacts
Similar contracts
- CHANCERY BATHROOM MODERNIZATIONBogotáDue Sep 1, 2026
- Design-Build Warehouse Construction Services, U.S. Embassy Kolonia, Federated States of MicronesiaPohnpeiDue Sep 10, 2026
- Fort Campbell Air Traffic Control Tower Due Aug 25, 2026
- Z2DA--589A7-23-305, Prepare Site for Choice Dining Equipment FY27 NRMDue Sep 24, 2026
- Sources Sought Notice_IMCOM Playgrounds SATOCDue Aug 26, 2026
- N33191-26-R-0032 D-B Maritime Center of Excellence Phase III TunisiaDue Sep 11, 2026