Phillippi Creek Phase II Maximum Allowable Dredging
- Response deadline
- Oct 28, 2026 Due in 32 days
- Date posted
- Sep 25, 2026
- Source
- Open notice
Description
What is the solicitation method? Project consists of dredging approximately 77,160 CY over an estimated 33,500 LF with dredge material management area preparation, material handling, disposal, turbidity control & monitoring, and site restoration. Dredging will be performed within the limits to restore the permitted design elevation of -4 feet MLW between US 41 & South Beneva Road. Bidder's offer shall be irrevocable for a period commencing upon the date of bid opening, for 180 days or until the County's issuance of Notice to Proceed, whichever occurs first. The County anticipates executing a construction contract that will remain in effect for the duration of the project. Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements.
Documents
No documents posted for this opportunity.
Similar contracts
- Engineering Services for Parks & Facilities LibraryFLDue Oct 21, 2026
- CEI Services for Manasota Road Bascule Bridge RehabilitationFLDue Oct 20, 2026
- Engineering Services for Carlton Water Treatment Plant Backup Power ImprovementsFLDue Oct 15, 2026
- Resurfacing South McCall Rd & Other South County RoadsFLDue Sep 23, 2026
- Resurfacing Bahia Vista St & Other North County RoadsFLDue Sep 18, 2026
- FDOT Project FM 452243-1 South River Rd - ITS Fiber - US 41 to Winchester BlvdFLDue Sep 16, 2026