OpenGov / Ionwave262903FB
Open
Engineering Services for Carlton Water Treatment Plant Backup Power Improvements
- Response deadline
- Oct 6, 2026 Due in 33 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
What is the solicitation method? The County requires a qualified engineering firm to provide engineering services for design, permitting, bid phase services, and services during construction for the Carlton Water Treatment Plant Backup Power Improvements Project. The County expects to award a CCNA Specific Project Agreement to run for the duration of the project. Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements.
Documents
No documents posted for this opportunity.
Similar contracts
- Resurfacing South McCall Rd & Other South County RoadsFLDue Sep 23, 2026
- Resurfacing Bahia Vista St & Other North County RoadsFLDue Sep 16, 2026
- FDOT Project FM 452243-1 South River Rd - ITS Fiber - US 41 to Winchester BlvdFLDue Sep 9, 2026
- Engineering and Construction Engineering and Inspection (CEI) Services for Celery Fields Regional Stormwater Facility (RSF) Central CellFLDue Sep 8, 2026
- Construction Manager at Risk (CMAR) Services for the Northeast Jail AdditionFLDue Jul 30, 2026
- Engineering Services for St. Armands Resiliency and Flood MitigationFLDue Jul 31, 2026