Myrtle Grove Elementary Outfall
- Response deadline
- Jul 9, 2026 Closed
- Date posted
- Jun 9, 2026
- Source
- Open notice
Description
The proposed improvements consist of the construction of approximately 1,400 linear feet of enclosed stormwater conveyance infrastructure extending along 62nd Avenue from the Myrtle Grove Elementary School (MGES) Pond to the intersection of Jackson Street and 62nd Street. The proposed drainage system will tie into an existing manhole located on the south side of the Jackson Street and 62nd Street intersection and ultimately discharge to the existing 62nd Street Pond. The construction will also include the installation of concrete driveways, minor utility adjustments for conflicts, minor sidewalk adjustments and the milling/resurfacing of 62nd Avenue from the MGES to the intersection with Jackson Street. The project is intended to improve hydraulic efficiency, increase system reliability during major storm events, and provide a controlled emergency overflow pathway for the MGES pond.
Documents
No documents posted for this opportunity.
Similar contracts
- CDBG-DR HS020 New Century Community Shelter Project Phase 2 - Building ConstructionFLDue Nov 16, 2026
- Mobile Dialysis Services for Escambia County CorrectionsFLDue Nov 3, 2026
- General Lines Insurance AgentFLDue Oct 30, 2026
- Intraosseous Needles and Driver - Sole SourceFLDue Sep 29, 2026
- Sole Source Advertisement for Authorized Vendor of Genuine Hamilton Medical EquipmentFLDue Sep 29, 2026
- CDBG-DR New Century Community Shelter Project, (HS020), Phase 1 - Selective DemolitionFLDue Oct 20, 2026