OpenGov / Ionwave2026-RFP-049
Open
McIntosh Power Plant Site Stormwater Modifications
City of Lakeland — LE - Engineering · FL
- Response deadline
- Jul 13, 2026 Closed
- Date posted
- May 20, 2026
- Source
- Open notice
Description
The purpose of this project is for modifications and removal of existing site conditions and construction of a new storm water management system McIntosh Power Plant. The project includes removal of pavement and infrastructure, site grading, and construction of two new stormwater retention ponds for areas that previously held Units 1, 2, and 3 and the Coal Yard at the McIntosh Power Plant. These two ponds are referred to as the "West Pond" and "Admin Pond" for the purposes of this project. Existing surface waters ponds within the project area will be altered, new outfalls will be installed, and riprap revetments will be installed to ensure no scouring or erosion will occur.
Documents
No documents posted for this opportunity.