Civic AI
Civic AI
Procurement intelligence
fl_pbcIFB-120-PB 26-12-1
Open

DJT Airfield Vault Building Expansion

Airports · FL
Response deadline
Oct 6, 2026
Due in 30 days
Date posted
Sep 7, 2026

Description

DJT Airfield Vault Building Expansion The work generally consists of: The expansion of the existing airfield electrical vault by approximately 2,500 square feet and includes interior renovation of the existing structure and replacement of the existing roof. The work includes modifications to the existing HVAC system and Fire Protection system. The expansion increases the vault electrical capacity also includes the relocation of the existing regulators, ALCMS control system, fiber optic cable power and communication wiring. Replacement of the standby emergency power generator is included as an additive alternate bid item. Commodity lines: - Airport Facility Construction - Demolition Services - Clearing and Grubbing Services - Sod, Grass - Excavation Services - Construction, General (Backfill Services, Digging, Ditching, - Electrical - Geotechnical - Soils - Testing Services - Concrete - Grass, Sod and Topsoil In Place - Utility Services, Electric - ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE) - ELECTRICAL CABLES AND WIRES (NOT ELECTRONIC) - Site Work - Roofing and Siding - Insulation - Masonry - Painting, Maintenance and Repair Services (Including Caulkin - Signage (Includes Destination, Routing and Advertising) - Heating, Ventilating and Air Conditioning (HVAC) - C.I.P., Fire Alarm System

Classifications

Documents (3)

  • PB 26-12 DJT Airfield Vault Expansion Bid Documents Part-1.pdf
    Not yet available
  • 03-PB 26-12 ad-InvtoBid Confidential.pdf
    Not yet available
  • PB 26-12 DJT Airfield Vault Expansion Bid Documents Part-2.pdf
    Not yet available

Contacts

Similar contracts

Explore more